Power plant · Bournemouth, Christchurch and Poole, England, United Kingdom

Chapel Lane Parley Solar Farm Phase 2

Chapel Lane Parley Solar Farm Phase 2 is a power plant in Bournemouth, Christchurch and Poole, England, United Kingdom, with 36 MW of capacity, operated by Eco Sustainable Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBournemouth, Christchurch and Poole (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressChapel Lane, Parley, Christchurch, Dorset, BH23 6BGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Sept 2013 (permit 8/13/0332, Town and Country Planning Act, issued by Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jul 2013 (reference 8/13/0332, planning authority Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Sept 2013 (granted, reference 8/13/0332, planning authority Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEco Sustainable SolutionsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity36 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area76.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7961, -1.8536DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Bournemouth, Christchurch and Poole, reference 8/13/0332)
  3. Permit applied for (planning authority Bournemouth, Christchurch and Poole, reference 8/13/0332)

How it compares

Chapel Lane Parley Solar Farm Phase 2 is the 341st-largest of 3,430 power plants in England and the 633rd-largest of 5,050 in the United Kingdom by capacity; its 36 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England341st of 3,43071,965 MW<0.1%
United Kingdom633rd of 5,050115,622 MW<0.1%
All power plants in our data2,465th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 196 grid connections (121 operating, 1,037 MW), 157 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 4.731 MW grid connection at RedhillGrid connection4.73 MWOperating0.7 km
Eco Parley Generation grid connectionGrid connection8.69 MWPlanned0.7 km
Eco Solar 1 grid connectionGrid connection23.6 MWOperating0.7 km
Redhill BSPSubstation——3.9 km
Ferndown PrimarySubstation——4.0 km
Redhill PrimarySubstation——4.0 km
Data Vault - Bournemouth BCP01Data center——8.4 km
Sky ChilworthData center——35 km
SCCData center——43 km

Operator and place

More from Eco Sustainable Solutions

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page