Eco Composting is a power plant in Bournemouth, Christchurch and Poole, England, United Kingdom, with 3.2 MW of capacity, operated by Eco Sustainable Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBournemouth, Christchurch and Poole (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressChapel Lane, Parley, Christchurch, BH23 6BGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Jul 2011 (permit 8/11/0268, Town and Country Planning Act, issued by Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 May 2011 (reference 8/11/0268, planning authority Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Jul 2011 (granted, reference 8/11/0268, planning authority Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEco Sustainable SolutionsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7862, -1.8541DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Eco Composting is the 2,512th-largest of 3,430 power plants in England and the 3,718th-largest of 5,050 in the United Kingdom by capacity; its 3.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,512th of 3,43071,985 MW<0.1%
United Kingdom3,718th of 5,050115,642 MW<0.1%
All power plants in our data9,602nd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 8/11/0268
  2. Started operating

Nearby

Within 50 km of this power plant: 197 grid connections (121 operating, 1,037 MW), 154 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Eco Parley Generation grid connectionGrid connection8.69 MWPlanned0.6 km
Eco Solar 1 grid connectionGrid connection23.6 MWOperating0.6 km
Eco SS Solar 2 grid connectionGrid connection5.61 MWOperating0.6 km
Redhill BSPSubstation——3.0 km
Redhill PrimarySubstation——3.0 km
Ferndown PrimarySubstation——4.3 km
Data Vault - Bournemouth BCP01Data center——7.3 km
Sky ChilworthData center——36 km
SCCData center——44 km

Operator and place

More from Eco Sustainable Solutions

Other power plants in England

All 5809 power plants in England, United Kingdom