Parley Renewable Energy Park (AD) is a cancelled power plant in Bournemouth, Christchurch and Poole, England, United Kingdom, with 1 MW of capacity, operated by Eco Sustainable Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBournemouth, Christchurch and Poole (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressChapel Lane, Parley, Christchurch, BH23 6BGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Sept 2013 (permit PL\1363\12, Town and Country Planning Act, issued by Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Aug 2012 (reference PL\1363\12, planning authority Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Sept 2013 (granted, reference PL\1363\12, planning authority Bournemouth, Christchurch and Poole)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEco Sustainable SolutionsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7865, -1.8545DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Bournemouth, Christchurch and Poole, reference PL\1363\12)
  3. Permit applied for (planning authority Bournemouth, Christchurch and Poole, reference PL\1363\12)

How it compares

Parley Renewable Energy Park (AD) is the 3,301st-largest of 3,430 power plants in England and the 4,866th-largest of 5,050 in the United Kingdom by capacity; its 1 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,301st of 3,43071,965 MW<0.1%
United Kingdom4,866th of 5,050115,622 MW<0.1%
All power plants in our data11,814th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 197 grid connections (121 operating, 1,037 MW), 154 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Eco Parley Generation grid connectionGrid connection8.69 MWPlanned0.6 km
Eco Solar 1 grid connectionGrid connection23.6 MWOperating0.6 km
Eco SS Solar 2 grid connectionGrid connection5.61 MWOperating0.6 km
Redhill BSPSubstation——3.0 km
Redhill PrimarySubstation——3.0 km
Ferndown PrimarySubstation——4.3 km
Data Vault - Bournemouth BCP01Data center——7.3 km
Sky ChilworthData center——36 km
SCCData center——44 km

Operator and place

More from Eco Sustainable Solutions

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page