Grid connection · England, United Kingdom

Danes Moss Landfill grid connection

Danes Moss Landfill grid connection is a grid connection in England, United Kingdom, with 1.97 MW of capacity, held by Infinis Energy Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceDANES MOSS LANDFILL grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at S.W. Macclesfield)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderInfinis Energy Services LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toS.W. Macclesfield (via a primary substation)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toDanes Moss Landfill Site (matched by name+coordinates+technology+capacity, 0.37 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity1.97 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyLandfill gasSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date1 Jul 1996SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.2425, -2.1475SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Danes Moss Landfill Site
  2. Permit granted: Danes Moss Landfill Site (planning authority Cheshire East)
  3. Permit applied for: Danes Moss Landfill Site (planning authority Cheshire East)

How it compares

Danes Moss Landfill grid connection is the 2,213th-largest of 2,533 grid connections in England and the 3,417th-largest of 3,903 in the United Kingdom by capacity; its 1.97 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,213th of 2,533319,370 MW<0.1%
United Kingdom3,417th of 3,903446,745 MW<0.1%
All grid connections in our data7,425th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 325 power plants (92 operating, 944 MW), 284 substations, 18 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Danes Moss Landfill SitePower plant1.6 MWOperating0.4 km
Danes Moss Landfill Site (Extension)Power plant2 MWOperating0.4 km
S.W. MacclesfieldSubstation——1.6 km
S.E. MacclesfieldSubstation——2.1 km
Withyfold DriveSubstation——3.4 km
Woodford Road - Battery Energy Storage SystemPower plant100 MWPermitted12 km
Datum Datacentres (MCR2)Data center——17 km
Delta HouseData center——17 km
CDL Strata Campus Data CentreData center——19 km

Holder, grid operator and place

More from Infinis Energy Services Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page