Grid connection · England, United Kingdom

Cressing Solar Farm grid connection

Cressing Solar Farm grid connection is a grid connection in England, United Kingdom, with 18 MW of capacity, held by Esco Developments Ltd.

Map: where Cressing Solar Farm grid connection lies
51.8389, 0.6078 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Braintree Local 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderEsco Developments LtdUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toCressing Solar Farm (Phase 2) (matched by shared name+coordinates+technology+capacity, 0.35 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity18 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date12 Mar 2016UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8389, 0.6078UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Cressing Solar Farm (Phase 2) (planning authority Braintree, reference 15/00949/FUL)
  2. Permit applied for: Cressing Solar Farm (Phase 2) (planning authority Braintree, reference 15/00949/FUL)

How it compares

Cressing Solar Farm grid connection is the 1,475th-largest of 3,539 grid connections in England and the 2,112th-largest of 4,870 in the United Kingdom by capacity; its 18 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,475th of 3,539341,715 MW<0.1%
United Kingdom2,112th of 4,870467,981 MW<0.1%
All grid connections in our data5,642nd of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 332 power plants (138 operating, 7,650 MW), 223 substations, 10 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cressing Solar Farm (Phase 1)Power plant5 MWOperating0.3 km
Cressing Solar Farm (Phase 2)Power plant18 MWCancelled0.3 km
Cressing Farm, Witham Road - Solar FarmPower plant13.8 MWPermitted0.4 km
Braintree Depot Primary 11kVSubstation——3.6 km
Witham Primary 11kVSubstation——4.1 km
Lake & Elliot Primary 11kVSubstation——4.9 km
Bramford to TwinsteadTransmission line—Permitted25 km
Imperium 315Data center——29 km
CityFibre CabinetsData center——30 km

Holder, grid operator and place

More from Esco Developments Ltd

Other grid connections in England

All 4837 grid connections in England, United Kingdom