Power plant · Braintree, England, United Kingdom

Cressing Solar Farm (Phase 2)

Cressing Solar Farm (Phase 2) is a cancelled power plant in Braintree, England, United Kingdom, with 18 MW of capacity, operated by Octopus Investments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBraintree (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand South Of Sheepcote Wood B, Witham Road, Cressing, Braintree, Essex, CM77 8NZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Nov 2015 (permit 15/00949/FUL, Town and Country Planning Act, issued by Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Jul 2015 (reference 15/00949/FUL, planning authority Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Nov 2015 (granted, reference 15/00949/FUL, planning authority Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOctopus InvestmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity18 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8412, 0.6045DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Cressing Solar Farm (Phase 2) is the 671st-largest of 3,430 power plants in England and the 1,235th-largest of 5,050 in the United Kingdom by capacity; its 18 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England671st of 3,43071,985 MW<0.1%
United Kingdom1,235th of 5,050115,642 MW<0.1%
All power plants in our data4,321st of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 10 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted25 km
Imperium 315Data center——29 km
CityFibre CabinetsData center——30 km
Kao Data KLON-02Data center——34 km

Operator and place

More from Octopus Investments

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page