Power plant · Braintree, England, United Kingdom

Cressing Farm, Witham Road - Solar Farm

Cressing Farm, Witham Road - Solar Farm is a permitted power plant in Braintree, England, United Kingdom, with 13.8 MW of capacity, operated by Eden Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBraintree (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCressing Farm Witham Road Cressing, CM77 8PDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jun 2025 (permit 24/02673/FUL, Town and Country Planning Act, issued by Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Jan 2025 (reference 24/02673/FUL, planning authority Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jun 2025 (granted, reference 24/02673/FUL, planning authority Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEden RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity13.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area40.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8373, 0.6129DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Cressing Farm, Witham Road - Solar Farm is the 1,390th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,164th-largest of 3,222 in the United Kingdom by capacity; its 13.8 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,390th of 2,174186,088 MW<0.1%
United Kingdom2,164th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data4,712th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 10 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted25 km
Imperium 315Data center——29 km
CityFibre CabinetsData center——30 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating34 km
Kao Data KLON-02Data center——34 km

Operator and place

More from Eden Renewables

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page