Grid connection · England, United Kingdom
Common Barn West Of A1 Southoe grid connection
Common Barn West Of A1 Southoe grid connection is a grid connection in England, United Kingdom, with 6.15 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Little Barford 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Common Barn Wind Farm (matched by shared name+coordinates+technology+capacity, 0.49 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 6.15 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Wind | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 12 Dec 2018 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.2743, -0.2802 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Commissioned: Common Barn Wind Farm
- Permit granted: Common Barn Wind Farm (appeal granted, planning authority Huntingdonshire, reference 1200803FUL)
- Permit granted: Common Barn Wind Farm (planning authority Huntingdonshire, reference 1200803FUL)
- Permit refused: Common Barn Wind Farm (planning authority Huntingdonshire, reference 1200803FUL)
- Permit applied for: Common Barn Wind Farm (planning authority Huntingdonshire, reference 1200803FUL)
How it compares
Common Barn West Of A1 Southoe grid connection is the 2,154th-largest of 3,539 grid connections in England and the 3,011th-largest of 4,870 in the United Kingdom by capacity; its 6.15 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,154th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 3,011th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,688th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 462 power plants (179 operating, 3,057 MW), 120 substations and 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Common Barn Wind Farm | Power plant | 6.2 MW | Operating | 0.5 km |
| Perry Primary 11kV | Substation | — | — | 2.0 km |
| Vicarage Lane, Diddington - Solar Arrays | Power plant | 35 MW | Planned | 2.3 km |
| East Park Energy | Power plant | 400 MW | Planned | 3.2 km |
| Offord Primary 11kV | Substation | — | — | 3.7 km |
| Cotton Primary 11kV | Substation | — | — | 6.4 km |
| West Cambridge Data Centre | Data center | — | — | 26 km |
| Redcentric Cambridge | Data center | — | — | 30 km |
| Data center, England (OSM way 87850427) | Data center | — | — | 31 km |
Grid operator and place
More from Eastern Power Networks plc
- Gt Yarmouth Power Station grid connection420 MW
- Kings Lynn Power Station grid connection350 MW
- Peterborough Power Station grid connection338 MW
- Sheringham Shoal Offshore Windfarm grid connection322 MW
- Battery storage 239.99 MW grid connection at Rayleigh Main 132kV240 MW
- Crown Point grid connection228 MW
- 31 Burrettgate Road grid connection200 MW
- (ANM) Aylmer Hall Farm grid connection200 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.