Power plant · Huntingdonshire, England, United Kingdom

Vicarage Lane, Diddington - Solar Arrays

Vicarage Lane, Diddington - Solar Arrays is a planned solar power plant in Huntingdonshire, England, United Kingdom, with 35 MW of capacity, operated by Cell Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHuntingdonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Of Vicarage Lane Diddington, PE19 5XUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Aug 2023 (reference 23/00258/FUL, planning authority Huntingdonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCell Energy Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity35 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar Photovoltaics (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area45 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2761, -0.2469DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Huntingdonshire, reference 23/00258/FUL)

How it compares

Vicarage Lane, Diddington - Solar Arrays is the 762nd-largest of 1,650 power plants planned, permitted or under construction in England and the 1,252nd-largest of 2,548 in the United Kingdom by capacity; its 35 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England762nd of 1,650171,264 MW<0.1%
United Kingdom1,252nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data2,552nd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
West Cambridge Data CentreData center——23 km
Redcentric CambridgeData center——28 km
Data center, England (OSM way 87850427)Data center——31 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page