RARE CONTEXT Request research

Grid connection · England, United Kingdom

Chapel Lane grid connection

Chapel Lane grid connection is a planned grid connection in England, United Kingdom, with 30 MW of capacity, held by Renewable Connections Developments Limited.

Map: where Chapel Lane grid connection lies
51.3133, 1.0473 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Canterbury)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderRenewable Connections Developments LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity30 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date19 Jul 2024UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3133, 1.0473UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Chapel Lane grid connection is the 1,078th-largest of 3,539 grid connections in England and the 1,536th-largest of 4,870 in the United Kingdom by capacity; its 30 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,078th of 3,539341,715 MW<0.1%
United Kingdom1,536th of 4,870467,981 MW<0.1%
All grid connections in our data4,855th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 216 power plants (85 operating, 7,353 MW), 127 substations, 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Britton Court Farm, Hackington Road - Solar FarmPower plant38 MWPermitted2.0 km
Canterbury South 33kVSubstation——3.7 km
Shelford WTE PlantPower plant16.1 MWCancelled4.0 km
Canterbury Town 11kVSubstation——4.1 km
Shelford Generation Plant IIPower plant8 MWOperating4.2 km
Whitstable 11kVSubstation——4.3 km
Richborough Connection ProjectTransmission line—Permitted14 km
The Bunker - South East Data CentreData center——18 km
Sota DatacentreData center——22 km

Holder, grid operator and place

More from Renewable Connections Developments Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page