Grid connection · England, United Kingdom
Chapel Lane grid connection
Chapel Lane grid connection is a planned grid connection in England, United Kingdom, with 30 MW of capacity, held by Renewable Connections Developments Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Canterbury) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Renewable Connections Developments Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 30 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Battery storage | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 19 Jul 2024 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 132 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.3133, 1.0473 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
Chapel Lane grid connection is the 1,078th-largest of 3,539 grid connections in England and the 1,536th-largest of 4,870 in the United Kingdom by capacity; its 30 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,078th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 1,536th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 4,855th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 216 power plants (85 operating, 7,353 MW), 127 substations, 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Britton Court Farm, Hackington Road - Solar Farm | Power plant | 38 MW | Permitted | 2.0 km |
| Canterbury South 33kV | Substation | — | — | 3.7 km |
| Shelford WTE Plant | Power plant | 16.1 MW | Cancelled | 4.0 km |
| Canterbury Town 11kV | Substation | — | — | 4.1 km |
| Shelford Generation Plant II | Power plant | 8 MW | Operating | 4.2 km |
| Whitstable 11kV | Substation | — | — | 4.3 km |
| Richborough Connection Project | Transmission line | — | Permitted | 14 km |
| The Bunker - South East Data Centre | Data center | — | — | 18 km |
| Sota Datacentre | Data center | — | — | 22 km |
Holder, grid operator and place
More from Renewable Connections Developments Limited
- (ANM) Green End grid connection25 MW
- Malham Farm Solar & Storage grid connection20 MW
- Fowl Farm grid connection20 MW
- (ANM) Alpington Hall Farm grid connection9.8 MW
- Chads Farm - Photovoltaic Arrays & Battery Storage522 MW · planned
- Shuttleworth House, Higher Shuttleworth - Battery Energy Storage System100 MW
- Old Allen Road, Wilsden - Battery Energy Storage System99.9 MW · planned
- Summerway Drove, East Bower - Battery Storage90 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.