Power plant · Somerset, England, United Kingdom

Summerway Drove, East Bower - Battery Storage

Summerway Drove, East Bower - Battery Storage is a permitted power plant in Somerset, England, United Kingdom, with 90 MW of capacity, operated by Renewable Connections Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSummerway Drove, Bridgwater, TA7 0HYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Feb 2025 (permit 08/23/00369, Town and Country Planning Act, issued by Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Nov 2023 (ref. 08/23/00369, Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Feb 2025 (granted, ref. 08/23/00369, Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable Connections Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity90 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1283, -2.9643DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Summerway Drove, East Bower - Battery Storage is the 337th-largest of 2,174 power plants planned, permitted or under construction in England and the 555th-largest of 3,222 in the United Kingdom by capacity; its 90 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England337th of 2,174186,088 MW<0.1%
United Kingdom555th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,475th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 324 grid connections (26 operating, 199 MW), 23 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 90 MW grid connection at Bridgwater SgpGrid connection——0.2 km
Summerway Drove PV Generator Site grid connectionGrid connection——0.6 km
Bridgwater Longacre Solar Plant grid connectionGrid connection——1.0 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned25 km
Hinkley Point C ConnectionTransmission line—Permitted26 km
Larkhill PrimarySubstation——29 km
Chilton Cantello PrimarySubstation——30 km
Sparkford PrimarySubstation——30 km

Operator and place

More from Renewable Connections Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom