Power plant · Bradford, England, United Kingdom
Old Allen Road, Wilsden - Battery Energy Storage System
Old Allen Road, Wilsden - Battery Energy Storage System is a planned power plant in Bradford, England, United Kingdom, with 99.9 MW of capacity, operated by Renewable Connections Developments Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bradford (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Old Allen Road, Wilsden, Bradford, BD13 3RU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 2 Oct 2025 (ref. 25/03275/MAF, Bradford) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Renewable Connections Developments Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 99.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.8075, -1.8631 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Old Allen Road, Wilsden - Battery Energy Storage System is the 296th-largest of 2,174 power plants planned, permitted or under construction in England and the 501st-largest of 3,222 in the United Kingdom by capacity; its 99.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 296th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 501st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,415th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 427 grid connections (231 operating, 2,105 MW), 246 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 100 MW grid connection at Peat Dyke Farm BESS Direct | Grid connection | 100 MW | Planned | 0.1 km |
| Bradford West | Substation | — | — | 0.4 km |
| Battery storage 99.9 MW grid connection at Old Allen Road BESS Direct | Grid connection | 99.9 MW | Planned | 1.0 km |
| Battery storage 99.8 MW grid connection at Lane Side BESS Direct | Grid connection | 99.8 MW | Planned | 1.2 km |
| Denholme | Substation | — | — | 2.3 km |
| Thornton | Substation | — | — | 2.6 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 40 km |
Operator and place
More from Renewable Connections Developments Limited
- Chads Farm - Photovoltaic Arrays & Battery Storage522 MW · planned
- Shuttleworth House, Higher Shuttleworth - Battery Energy Storage System100 MW
- Summerway Drove, East Bower - Battery Storage90 MW · permitted
- Woodstock Road, Yarnton - Battery Energy Storage System52 MW · permitted
- Vicarage Drove - Solar farm & Battery storage49.9 MW · permitted
- Church Farm, Kingston On Soar - Solar Photovoltaic Farm49.9 MW · permitted
- Snakes Meadow - Solar Farm45.5 MW · permitted
- Bradley Road - Solar Farm43.7 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.