Campsall Road grid connection is a grid connection in England, United Kingdom, with 2.7 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Askern Green Park)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toDoncaster B/Thorpe Marsh (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity2.7 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date31 May 2018Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date8 Jun 2018Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.6200, -1.1617Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Campsall Road grid connection is the 2,051st-largest of 2,533 grid connections in England and the 3,141st-largest of 3,903 in the United Kingdom by capacity; its 2.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,051st of 2,533319,370 MW<0.1%
United Kingdom3,141st of 3,903446,745 MW<0.1%
All grid connections in our data7,143rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Connected

Nearby

Within 50 km of this grid connection: 490 power plants (137 operating, 4,249 MW), 361 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
AskernSubstation——0.2 km
Askern Colliery solar farmPower plant5 MWOperating0.4 km
Norton Community Wind TurbinesPower plant5 MWCancelled2.6 km
Croft Farm, Askern Road - Solar Array & Hydrogen PlantPower plant2.5 MWUnder construction4.3 km
BrodsworthSubstation——6.9 km
BentleySubstation——6.9 km
ThalesData center——13 km
HSBC Wakefield Data CentreData center——17 km
nLighten LeedsData center——18 km