Power plant · Doncaster, England, United Kingdom

Norton Community Wind Turbines

Norton Community Wind Turbines is a cancelled wind power plant in Doncaster, England, United Kingdom, with 5 MW of capacity, operated by Origin Energy CIC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceNORTON COMMUNITY WIND TURBINESDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
LocationDoncaster (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGreengate Road, Norton, Doncaster, South Yorkshire, DN6DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Aug 2012 (reference 12/02140/FUL, planning authority Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Mar 2017 (refused, reference 12/02140/FUL, planning authority Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOrigin Energy CIC (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units2 units (2.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.6272, -1.1992DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Doncaster, reference 12/02140/FUL)
  2. Permit applied for (planning authority Doncaster, reference 12/02140/FUL)

How it compares

Norton Community Wind Turbines is the 2,173rd-largest of 4,036 power plants in England and the 3,291st-largest of 5,837 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,173rd of 4,036134,406 MW<0.1%
United Kingdom3,291st of 5,837200,833 MW<0.1%
All power plants in our data9,138th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 434 grid connections (224 operating, 2,441 MW), 369 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Campsall Road grid connectionGrid connection2.7 MWOperating2.6 km
Campsall Road grid connectionGrid connection1 MWOperating2.6 km
AskernSubstation——2.8 km
Solar 4.98 MW grid connection at AskernGrid connection4.98 MWOperating3.2 km
BrodsworthSubstation——6.9 km
South ElmsallSubstation——7.3 km
HSBC Wakefield Data CentreData center——14 km
ThalesData center——15 km
nLighten LeedsData center——15 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page