Burnt House Solar Farm grid connection

Burnt House Solar Farm grid connection is a grid connection in England, United Kingdom, with 4.75 MW of capacity, held by Abbey Properties Cambs.

Map: where Burnt House Solar Farm grid connection lies
52.5291, -0.0226 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at March Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderAbbey Properties CambsUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toTurves Solar Farm (matched by coordinates+technology+capacity+company, 0.19 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity4.75 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date19 Feb 2013UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.5291, -0.0226UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Turves Solar Farm
  2. Permit granted: Turves Solar Farm (planning authority Fenland, reference F/YR11/0362/F)
  3. Permit applied for: Turves Solar Farm (planning authority Fenland, reference F/YR11/0362/F)

How it compares

Burnt House Solar Farm grid connection is the 2,397th-largest of 3,539 grid connections in England and the 3,315th-largest of 4,870 in the United Kingdom by capacity; its 4.75 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,397th of 3,539341,715 MW<0.1%
United Kingdom3,315th of 4,870467,981 MW<0.1%
All grid connections in our data7,021st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 363 power plants (140 operating, 4,953 MW), 83 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Turves/Burtnhouse Solar Farm ExtensionPower plant4.7 MWOperating0.1 km
Turves Solar FarmPower plant5 MWOperating0.2 km
Burnt House FarmPower plant6 MWOperating1.1 km
March Primary 11kVSubstation——5.8 km
March Grid 33kVSubstation——7.7 km
Whittlesey Primary 11kVSubstation——8.0 km
Positive ParkData center——8.1 km
Data center, England (OSM way 87850427)Data center——17 km
Longmarsh Green EnergyData center—Planned33 km