Power plant · Fenland, England, United Kingdom

Burnt House Farm

Burnt House Farm is a wind power plant in Fenland, England, United Kingdom, with 6 MW of capacity, operated by Fivestone Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFenland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBurnt House Road, Whittlesey, Burnthouse Sidings, Peterborough, Cambs, PE7 2HPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2013DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Jul 2011 (permit F/YR09/0392/F, Town and Country Planning Act, issued by Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jun 2009 (reference F/YR09/0392/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jul 2011 (appeal granted, reference F/YR09/0392/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jul 2011 (granted, reference F/YR09/0392/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Jan 2010 (refused, reference F/YR09/0392/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFivestone LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5378, -0.0304DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Fenland, reference F/YR09/0392/F)
  3. Permit granted (appeal granted, planning authority Fenland, reference F/YR09/0392/F)
  4. Permit refused (planning authority Fenland, reference F/YR09/0392/F)
  5. Permit applied for (planning authority Fenland, reference F/YR09/0392/F)

How it compares

Burnt House Farm is the 2,018th-largest of 4,035 power plants in England and the 3,081st-largest of 5,834 in the United Kingdom by capacity; its 6 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,018th of 4,035134,434 MW<0.1%
United Kingdom3,081st of 5,834200,500 MW<0.1%
All power plants in our data11,622nd of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Positive ParkData center——7.8 km
Data center, England (OSM way 87850427)Data center——16 km
Longmarsh Green EnergyData center—Planned33 km
Kings Lynn B Connection ProjectTransmission line—Permitted34 km
Triton Knoll Electrical SystemTransmission line—Permitted46 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned48 km

Operator and place

More from Fivestone Ltd

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page