Grid connection · England, United Kingdom

Battery storage and Solar 40 MW grid connection at Kiddal Lane PV & BESS

Battery storage and Solar 40 MW grid connection at Kiddal Lane PV & BESS is a planned grid connection in England, United Kingdom, with 40 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Kiddal Lane PV & BESS)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toBramham (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity40 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date14 Jun 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8577, -1.4245Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage and Solar 40 MW grid connection at Kiddal Lane PV & BESS is the 740th-largest of 2,533 grid connections in England and the 1,138th-largest of 3,903 in the United Kingdom by capacity; its 40 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England740th of 2,533319,370 MW<0.1%
United Kingdom1,138th of 3,903446,745 MW<0.1%
All grid connections in our data4,292nd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 346 power plants (94 operating, 3,887 MW), 321 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Wothersome Grange Farm House AD - cropsPower plant1 MWOperating3.2 km
WhinmoorSubstation——3.5 km
Coal Road, Whinmoor - Solar PanelsPower plant1.6 MWPermitted3.5 km
Sledmere GarthSubstation——3.8 km
SeacroftSubstation——4.2 km
Land off Paradise FarmPower plant5 MWCancelled5.5 km
Yorkshire GREENTransmission line—Permitted11 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page