Grid connection · England, United Kingdom

Battery storage 35.5 MW grid connection at Tickhill Maltby BESS Direct

Battery storage 35.5 MW grid connection at Tickhill Maltby BESS Direct is a planned grid connection in England, United Kingdom, with 35.5 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Tickhill Maltby BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toThurcroft (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity35.5 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date23 Apr 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.4254, -1.1647Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage 35.5 MW grid connection at Tickhill Maltby BESS Direct is the 805th-largest of 2,533 grid connections in England and the 1,246th-largest of 3,903 in the United Kingdom by capacity; its 35.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England805th of 2,533319,370 MW<0.1%
United Kingdom1,246th of 3,903446,745 MW<0.1%
All grid connections in our data4,446th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 530 power plants (154 operating, 4,492 MW), 257 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Aven Industrial EstatePower plant20 MWCancelled0.3 km
Tickhill RoadSubstation——0.3 km
Mere Flats Solar FarmPower plant56 MWPermitted4.4 km
Mere Flats Solar FarmPower plant16 MWPlanned4.4 km
New Orchard LaneSubstation——6.4 km
CosthorpeSubstation——6.7 km
North Humber to High MarnhamTransmission line—Planned20 km
Chesterfield to WillingtonTransmission line—Planned47 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page