RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Land At Cressing Farm grid connection

(ANM) Land At Cressing Farm grid connection is a planned grid connection in England, United Kingdom, with 13.8 MW of capacity, held by Eden CF Solar Limited.

Map: where (ANM) Land At Cressing Farm grid connection lies
51.8389, 0.6078 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Braintree Local 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderEden CF Solar LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toCressing Farm, Witham Road - Solar Farm (matched by shared name+coordinates+technology+capacity+company, 0.39 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity13.8 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date1 Oct 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2024 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8389, 0.6078UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Cressing Farm, Witham Road - Solar Farm (planning authority Braintree, reference 24/02673/FUL)
  2. Permit applied for: Cressing Farm, Witham Road - Solar Farm (planning authority Braintree, reference 24/02673/FUL)

How it compares

(ANM) Land At Cressing Farm grid connection is the 1,665th-largest of 3,539 grid connections in England and the 2,367th-largest of 4,870 in the United Kingdom by capacity; its 13.8 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,665th of 3,539341,715 MW<0.1%
United Kingdom2,367th of 4,870467,981 MW<0.1%
All grid connections in our data5,940th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 332 power plants (138 operating, 7,650 MW), 223 substations, 10 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cressing Solar Farm (Phase 1)Power plant5 MWOperating0.3 km
Cressing Solar Farm (Phase 2)Power plant18 MWCancelled0.3 km
Cressing Farm, Witham Road - Solar FarmPower plant13.8 MWPermitted0.4 km
Braintree Depot Primary 11kVSubstation——3.6 km
Witham Primary 11kVSubstation——4.1 km
Lake & Elliot Primary 11kVSubstation——4.9 km
Bramford to TwinsteadTransmission line—Permitted25 km
Imperium 315Data center——29 km
CityFibre CabinetsData center——30 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page