(ANM) Barleylands Road grid connection

(ANM) Barleylands Road grid connection is a planned grid connection in England, United Kingdom, with 49.9 MW of capacity, held by Anglo Renewables Limited.

Map: where (ANM) Barleylands Road grid connection lies
51.5954, 0.4490 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Tilbury)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderAnglo Renewables LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWhites Farm - Battery Storage (matched by coordinates+technology+capacity+company, 0.23 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity49.9 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date17 May 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date30 Oct 2030 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5954, 0.4490UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit refused: Whites Farm - Battery Storage (planning authority Basildon, reference 22/01108/FULL)
  2. Permit applied for: Whites Farm - Battery Storage (planning authority Basildon, reference 22/01108/FULL)

How it compares

(ANM) Barleylands Road grid connection is the 698th-largest of 3,539 grid connections in England and the 997th-largest of 4,870 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England698th of 3,539341,715 MW<0.1%
United Kingdom997th of 4,870467,981 MW<0.1%
All grid connections in our data4,183rd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 412 substations, 370 power plants (156 operating, 8,561 MW), 66 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Whites Farm - Battery StoragePower plant49.9 MWCancelled0.2 km
Barleylands Solar FarmPower plant17 MWPermitted0.7 km
The Limes 11kVSubstation——1.5 km
Crays Hall Farm - Solar ArraysPower plant25.6 MWOperating2.2 km
Gardiners Ln Primary 11kVSubstation——2.5 km
Nevendon Grid 33kVSubstation——2.5 km
Imperium 315Data center——2.7 km
CityFibre CabinetsData center——14 km
Fujitsu Data CentreData center——18 km

Holder, grid operator and place

More from Anglo Renewables Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom