RARE CONTEXT Request research

Grid connection · England, United Kingdom

Abbess Road grid connection

Abbess Road grid connection is a grid connection in England, United Kingdom, with 6 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Abbess Road grid connection lies
51.7779, 0.2579 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at White Roding Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWhite Roding Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity6 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyGasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date11 Sept 2019UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7779, 0.2579UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Abbess Road grid connection is the 2,165th-largest of 3,539 grid connections in England and the 3,023rd-largest of 4,870 in the United Kingdom by capacity; its 6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,165th of 3,539341,715 MW<0.1%
United Kingdom3,023rd of 4,870467,981 MW<0.1%
All grid connections in our data6,701st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 468 substations, 395 power plants (151 operating, 7,866 MW), 72 data centers (1 operating, 88 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
White Roding Primary 11kVSubstation——2.7 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating8.7 km
Ongar Landfill SchemePower plant1 MWOperating8.8 km
Ongar Landfill Scheme 2Power plant1.8 MWOperating8.9 km
Kao Data KLON-02Data center——8.9 km
Kao Data KLON-01Data center——8.9 km
Ongar Primary 11kVSubstation——9.0 km
Ongar Landfill Ground mounted solar photovoltaicPower plant8.8 MWCancelled9.0 km
New Harlow Primary 11kVSubstation——10 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page