RARE CONTEXT Request research

Substation · the United Kingdom

Kirkby Central T1 / Northwood T1 / Tower Hill (Bank La) T1 / Westvale T1 Substation

Kirkby Central T1 / Northwood T1 / Tower Hill (Bank La) T1 / Westvale T1 Substation is a 33 kV primary substation in the United Kingdom, with 9.69 MVA of demand headroom and 6.58 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).

Map: where Kirkby Central T1 / Northwood T1 / Tower Hill (Bank La) T1 / Westvale T1 lies
53.4824, -2.8867 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceKIRKBY CENTRAL T1 / NORTHWOOD T1 / TOWER HILL (BANK LA) T1 / WESTVALE T1SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LocationUnited KingdomSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom9.69 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom6.58 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity30 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kV (levels 33, 11 kV)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates53.4824, -2.8867SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 464 grid connections (296 operating, 3,179 MW), 379 power plants (114 operating, 5,396 MW), 17 data centers, 4 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPower plant1 MWPlanned2.0 km
Charleywood Road, Knowsley Industrial ParkPower plant49.9 MWCancelled2.1 km
Larkins Farm, Gellings Lane - Solar FarmPower plant1.5 MWCancelled2.4 km
Fazakerley - United Utilities W W T W grid connectionGrid connection1.5 MWOperating2.8 km
Kirkby Moss grid connectionGrid connection80 MWPlanned3.2 km
Sandy Brow Lane (Spencers Farm) grid connectionGrid connection82.8 MWPlanned3.4 km
Data center, England (OSM way 1551100328)Data center——16 km
nLighten Edge Data Centre LiverpoolData center——16 km
Iron MountainData center——19 km

Grid operator and place

More from SP Manweb plc

Candidate sites around this substation

1 site of land near Kirkby Central T1 / Northwood T1 / Tower Hill (Bank La) T1 / Westvale T1 has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in the United Kingdom

All 4347 substations in the United Kingdom

Data on this page