Abergele T1 / Pensarn T1 Substation

Abergele T1 / Pensarn T1 Substation is a 33 kV primary substation in the United Kingdom, with 0.65 MVA of demand headroom and 3.29 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).

Map: where Abergele T1 / Pensarn T1 lies
53.2754, -3.5610 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceABERGELE T1 / PENSARN T1SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LocationUnited KingdomSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom0.65 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom3.29 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity10 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kV (levels 33, 11 kV)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates53.2754, -3.5610SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 154 power plants (56 operating, 7,476 MW), 144 grid connections (113 operating, 1,313 MW), 2 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Rhyl Flats grid connectionGrid connection92 MWOperating2.2 km
Kinmel Estate Solar Farm Ph 2 grid connectionGrid connection28 MWOperating2.8 km
Kinmel 1 CICPower plant5 MWOperating2.9 km
Bodelwyddan, Abergele Road - Solar Farm & Battery StoragePower plant110 MWPlanned3.4 km
Bodelwyddan, Abergele Road - Solar Farm & Battery StoragePower plant110 MWPlanned3.4 km
Neud Trydan grid connectionGrid connection1 MWOperating3.7 km
North Wales Wind Farms ConnectionTransmission line—Permitted22 km
nLighten Edge Data Centre LiverpoolData center——40 km
nLighten ChesterData center——42 km

Grid operator and place

More from SP Manweb plc

Other substations in the United Kingdom