RARE CONTEXT Request research

Substation · England, United Kingdom

Harrow North Grid 11kV Substation

Harrow North Grid 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 11.6 MVA of demand headroom and 39.6 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Harrow North Grid 11kV lies
51.5810, -0.3678 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom11.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom39.6 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity36 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5810, -0.3678UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 369 power plants (127 operating, 2,612 MW), 361 grid connections (251 operating, 2,296 MW), 157 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kao Data KLON-05Data center——4.0 km
Kyndryl UK LtdData center——4.8 km
David Lloyd Leisure, Ducks Hill Road - Solar PanelsPower plant1 MWCancelled6.1 km
First Way Wembley grid connectionGrid connection5 MWOperating7.0 km
Harefield Solar grid connectionGrid connection30 MWPlanned7.8 km
The Chess BuildingData center——8.0 km
Bio Products Laboratory grid connectionGrid connection2 MWOperating8.1 km
Premier Park Road - Photovoltaic SystemPower plant1.44 MWCancelled8.4 km
Unit F, 6, Premier Park Road - Solar PanelsPower plant1.31 MWCancelled8.4 km

Grid operator and place

More from Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page