Substation · England, United Kingdom

Copley Dene Primary

Copley Dene Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom42.9 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 30 / 37.5MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromEaling BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementReplace the existing transformers with 80MVA units (due Jul 2029)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by substation thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Limited (amber on the heat map, limited by upstream fault level constraint)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage66 kV (levels 66, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5139, -0.3089SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 364 power plants (121 operating, 1,957 MW), 159 data centers (1 operating, 88 MW), 67 grid connections (39 operating, 414 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
RedwireData center——0.1 km
Equinix LD3Data center——2.7 km
Data center, England (OSM way 27618478)Data center——2.9 km
Premier Park Road - Photovoltaic SystemPower plant1.44 MWPermitted3.8 km
Unit F, 6, Premier Park Road - Solar PanelsPower plant1.31 MWPermitted3.8 km
WillesdenPower plant2 MWCancelled4.6 km
Brentford F C Training Ground 100 grid connectionGrid connection120 MWPlanned5.0 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating6.1 km
North Hyde Sub STN grid connectionGrid connection9.5 MWOperating8.1 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1215 substations in England, United Kingdom