Power plant · Darlington, England, United Kingdom

Whinfield Solar Farm

Whinfield Solar Farm is a permitted power plant in Darlington, England, United Kingdom, with 33 MW of capacity, operated by Alpha Real Capital LLP.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDarlington (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAycliffe Village & Adj Whinfield House, Lime Lane, Brafferton, Darlington, DL1 3LEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date4 Oct 2022 (permit DM/21/02816/FPA, Town and Country Planning Act, issued by Darlington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Aug 2021 (reference DM/21/02816/FPA, planning authority Darlington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Oct 2022 (granted, reference DM/21/02816/FPA, planning authority Darlington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAlpha Real Capital LLPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity33 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area42.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5941, -1.5249DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Whinfield Solar Farm is the 971st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,543rd-largest of 3,222 in the United Kingdom by capacity; its 33 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England971st of 2,174186,088 MW<0.1%
United Kingdom1,543rd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,914th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 260 grid connections (130 operating, 1,282 MW), 158 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 22.99 MW grid connection at Whinfield House PVGrid connection23 MWOperating0.1 km
SkernesideSubstation——1.8 km
Solar 52 MW grid connection at Ketton Solar DirectGrid connection52 MWPlanned2.3 km
Aycliffe ForrestSubstation——2.8 km
Battery storage and Solar 61.9 MW grid connection at Stanley Farm HybridGrid connection61.9 MWPlanned3.2 km
Aycliffe IndustrialSubstation——3.2 km
Pulsant data center, EnglandData center——14 km
DXC Wynyard Data CenterData center——15 km
Lumen Technologies data center, MiddlesbroughData center——19 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page