Power plant · Cardiff, Wales, United Kingdom

Trident Park

Trident Park is a cancelled power plant in Cardiff, Wales, United Kingdom, with 30 MW of capacity, operated by Viridor.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCardiff (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTrident Park, Rumney, Cardiff, South Glamorgan, CF3DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Nov 2008 (reference 08/02616/E, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Jan 2010 (appeal withdrawn, reference 08/02616/E, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Jul 2009 (refused, reference 08/02616/E, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorViridorDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5204, -3.1084DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (appeal withdrawn, planning authority Cardiff, reference 08/02616/E)
  2. Permit refused (planning authority Cardiff, reference 08/02616/E)
  3. Permit applied for (planning authority Cardiff, reference 08/02616/E)

How it compares

Trident Park is the 48th-largest of 424 power plants in Wales and the 727th-largest of 5,050 in the United Kingdom by capacity; its 30 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales48th of 4249,068 MW0.33%
United Kingdom727th of 5,050115,622 MW<0.1%
All power plants in our data2,805th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Microsoft Newport data centreData center——5.8 km
Centerprise International NewportData center——6.3 km
Vantage Data Centers data center, NewportData center——6.3 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned27 km
Hinkley Point C ConnectionTransmission line—Permitted31 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating44 km

Operator and place

More from Viridor

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page