Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWalesOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
AddressCeltic Way, Newport, NP10 8BEOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorVantage Data Centers, LLCOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://vantage-dc-cardiff.co.uk/OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint29,886 m² (building, 3 buildings)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.5554, -3.0374OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Vantage Data Centers, LLC operates 3 of the 191 data centers in the United Kingdom in our data with a named owner; 12 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%
Vantage Data Centers, LLC13th31.6%

Nearby

Within 50 km of this data center: 453 power plants (181 operating, 1,816 MW), 344 grid connections, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Newport, Docksway Landfill Site grid connectionGrid connection——2.6 km
Docksway Landfill SchemePower plant2 MWOperating2.6 km
Wentlooge Renewable Energy HubPower plant125 MWPlanned2.6 km
Docks Way Solar FarmPower plant2.37 MWPermitted2.7 km
Hawse Farm, Wentloog Levels Solar Park grid connectionGrid connection——3.2 km
Newport, Docks Way, Newport NP20 2NY grid connectionGrid connection——3.2 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned28 km
Hinkley Point C ConnectionTransmission line—Permitted31 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating39 km