Parc Stormy, Stormy Down
Parc Stormy, Stormy Down is a power plant in Bridgend, Wales, United Kingdom, with 2.5 MW of capacity, operated by Cenin Renewables Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bridgend (coordinates), Wales | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Parc Stormy, Stormy Down, Pyle, Bridgend, CF33 4RS | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 18 Aug 2016 (permit P/15/868/FUL, Town and Country Planning Act, issued by Bridgend) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Jan 2016 (reference P/15/868/FUL, planning authority Bridgend) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 18 Aug 2016 (granted, reference P/15/868/FUL, planning authority Bridgend) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Cenin Renewables Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (2.5 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.5082, -3.6687 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Parc Stormy, Stormy Down is the 349th-largest of 424 power plants in Wales and the 3,943rd-largest of 5,050 in the United Kingdom by capacity; its 2.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Wales | 349th of 424 | 9,068 MW | <0.1% |
| United Kingdom | 3,943rd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 9,997th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 202 grid connections and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Cenin T2, Import MPAN Site 4 Parc Stormy 33KV TX grid connection | Grid connection | — | — | 0.2 km |
| Stormy Down PV Generation, Bridgend grid connection | Grid connection | — | — | 0.2 km |
| Tythegston, Stormy Lane, Stormy Down grid connection | Grid connection | — | — | 0.3 km |
| CGI Datacenter | Data center | — | — | 6.4 km |
| Centerprise International (Distribution) | Data center | — | — | 33 km |
| Microsoft Newport data centre | Data center | — | — | 44 km |
Operator and place
More from Cenin Renewables Limited
- Vianshill Farm, Parc Dyffryn - Solar Farm & Battery Storage65 MW · permitted
- Ty’n y Waun - Solar Farm (Bridgend Energy Hub)40 MW · permitted
- Mynydd Maen Solar Farm (Cil-Lonydd)35 MW · planned
- Mynydd Maen Solar Farm (Cil-Lonydd)35 MW · permitted
- Llanwonno - Wind Farm30.7 MW · planned
- Llanwonno - Wind Farm30.4 MW · planned
- Llanwonno - Wind Farm30 MW · planned
- Manmoel Wind Farm28 MW · permitted
Other power plants in Wales
- Dinorwig1,728 MW
- Gwynt y Mor576 MW
- Ffestiniog360 MW
- Port Talbot Renewable Energy Plant350 MW
- Anglesey Biomass Power Station299 MW
- Tidal Lagoon Swansea Bay240 MW
- Pen Y Cymoedd228 MW
- Carnedd Wen Wind Farm150 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.