Power plant · Bridgend, Wales, United Kingdom

Ty’n y Waun - Solar Farm (Bridgend Energy Hub)

Ty’n y Waun - Solar Farm (Bridgend Energy Hub) is a permitted solar power plant in Bridgend, Wales, United Kingdom, with 40 MW of capacity, operated by Cenin Renewables Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBridgend (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBtw Heol Laethog and Heol Y Cyw, Bridgend, CF35 6HLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Oct 2024 (permit DNS/3279521, Welsh Government development of national significance, issued by Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Jun 2023 (reference DNS/3279521, planning authority Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Oct 2024 (granted, reference DNS/3279521, planning authority Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCenin Renewables Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity40 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area40.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5446, -3.5182DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Welsh Government (NSIP), reference DNS/3279521)
  2. Permit applied for (planning authority Welsh Government (NSIP), reference DNS/3279521)

How it compares

Ty’n y Waun - Solar Farm (Bridgend Energy Hub) is the 57th-largest of 157 power plants planned, permitted or under construction in Wales and the 1,135th-largest of 2,548 in the United Kingdom by capacity; its 40 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales57th of 15716,088 MW0.25%
United Kingdom1,135th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data2,366th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
CGI DatacenterData center——7.3 km
Centerprise International (Distribution)Data center——22 km
Microsoft Newport data centreData center——33 km

Operator and place

More from Cenin Renewables Limited

Other power plants in Wales

All 622 power plants in Wales, United Kingdom

Data on this page