Llanwonno - Wind Farm
Llanwonno - Wind Farm is a planned power plant in England, United Kingdom, with 30.7 MW of capacity, operated by Cenin Renewables Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Llanwonno, Phase 2 Wind Farm, Llwycelyn, Pontypridd, CF37 2BN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Mar 2025 (reference CAS-02125-Q0T5P0, planning authority Welsh Government (NSIP)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Cenin Renewables Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 30.7 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6028, -3.3391 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Llanwonno - Wind Farm is the 987th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,565th-largest of 3,222 in the United Kingdom by capacity; its 30.7 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 987th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,565th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,971st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 274 grid connections, 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| GLYN TAF Solar Park grid connection | Grid connection | — | — | 2.0 km |
| Berthllwyd Solar Farm grid connection | Grid connection | — | — | 2.2 km |
| Wind 6 MW grid connection at Upper Boat Bsp | Grid connection | — | — | 2.8 km |
| Centerprise International (Distribution) | Data center | — | — | 8.2 km |
| CGI Datacenter | Data center | — | — | 21 km |
| Microsoft Newport data centre | Data center | — | — | 21 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 45 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 49 km |
Operator and place
More from Cenin Renewables Limited
- Vianshill Farm, Parc Dyffryn - Solar Farm & Battery Storage65 MW · permitted
- Ty’n y Waun - Solar Farm (Bridgend Energy Hub)40 MW · permitted
- Mynydd Maen Solar Farm (Cil-Lonydd)35 MW · planned
- Mynydd Maen Solar Farm (Cil-Lonydd)35 MW · permitted
- Llanwonno - Wind Farm30.4 MW · planned
- Llanwonno - Wind Farm30 MW · planned
- Manmoel Wind Farm28 MW · permitted
- Llwyncelyn Wind Farm7.2 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.