Power plant · Cardiff, Wales, United Kingdom

Panasonic Manufacturing, Pentwyn - BESS

Panasonic Manufacturing, Pentwyn - BESS is a power plant under construction in Cardiff, Wales, United Kingdom, with 1.08 MW of capacity, operated by Panasonic Manufacturing UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCardiff (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMatsushita Electrical, Wharfedale Road, Pentwyn, Cardiff, CF23 7HBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Jun 2024 (permit 24/00924/FUL, Town and Country Planning Act, issued by Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Apr 2024 (reference 24/00924/FUL, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Jun 2024 (granted, reference 24/00924/FUL, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPanasonic Manufacturing UKDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.08 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5295, -3.1402DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Cardiff, reference 24/00924/FUL)
  3. Permit applied for (planning authority Cardiff, reference 24/00924/FUL)

How it compares

Panasonic Manufacturing, Pentwyn - BESS is the 166th-largest of 177 power plants planned, permitted or under construction in Wales and the 3,074th-largest of 3,222 in the United Kingdom by capacity; its 1.08 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales166th of 17716,801 MW<0.1%
United Kingdom3,074th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,306th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Microsoft Newport data centreData center——7.3 km
Centerprise International NewportData center——7.7 km
Vantage Data Centers data center, NewportData center——7.7 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned30 km
Hinkley Point C ConnectionTransmission line—Permitted33 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating46 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page