Power plant · Newport, Wales, United Kingdom
North Court Farm, Redwick - Wind Turbine
North Court Farm, Redwick - Wind Turbine is a planned power plant in Newport, Wales, United Kingdom, with 3.5 MW of capacity, operated by Clean Earth Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Newport (coordinates), Wales | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Se/O Tesco Distribution Steelworks, Access Road, A4810 Magor Monmouthshire, Caldicot, NP26 3DX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Jul 2023 (reference DM/2023/01045, planning authority Newport) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Clean Earth Energy Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 3.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (3.5 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.5580, -2.8516 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
North Court Farm, Redwick - Wind Turbine is the 141st-largest of 177 power plants planned, permitted or under construction in Wales and the 2,661st-largest of 3,222 in the United Kingdom by capacity; its 3.5 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Wales | 141st of 177 | 16,801 MW | <0.1% |
| United Kingdom | 2,661st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,819th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 336 grid connections (4 operating, 35.5 MW), 11 data centers, 6 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Land at North Court Farm grid connection | Grid connection | — | — | 0.2 km |
| Proposed Solar Park grid connection | Grid connection | — | — | 0.2 km |
| Magor, Longlands Lane WT grid connection | Grid connection | — | — | 0.8 km |
| Vantage Data Centers - CWL13 | Data center | — | — | 13 km |
| Vantage Data Centers data center, Newport | Data center | — | — | 13 km |
| Centerprise International Newport | Data center | — | — | 13 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 24 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 25 km |
| Alderton Primary | Substation | — | — | 43 km |
Operator and place
More from Clean Earth Energy Limited
- Bears Down Wind Farm22.5 MW · planned
- Low Drumclog Farm, Drumclog - 3 Wind Turbines20 MW · permitted
- Dungavel House, IRC Muirkirk Road - Wind Farm11.4 MW · permitted
- Goonamarth Farm - Wind Turbine4.3 MW · under construction
- Higher Biscovillack Farm, Greensplat - Wind Turbine4.3 MW · planned
- Lower Longstones, St Mewan Wind Turbine4.1 MW · permitted
- Burngullow Common - Wind Turbine4.1 MW · permitted
- Accolade Wines2.5 MW
Other power plants in Wales
- Dinorwig1,728 MW
- Gwynt y Mor576 MW
- Ffestiniog360 MW
- Port Talbot Renewable Energy Plant350 MW
- Anglesey Biomass Power Station299 MW
- Tidal Lagoon Swansea Bay240 MW
- Pen Y Cymoedd228 MW
- Carnedd Wen Wind Farm150 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.