Power plant · County Durham, England, United Kingdom

Hedley Hope, Tow Law - Wind Turbines

Hedley Hope, Tow Law - Wind Turbines is a planned power plant in County Durham, England, United Kingdom, with 31.5 MW of capacity, operated by Cleanearth Energy Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHigh Hedleyhope Farm High Hedleyhope Farm Road East Hedleyhope, DL13 4BWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Nov 2023 (reference DM/23/03047/FPA, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCleanearth Energy Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity31.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units7 units (4.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.7528, -1.7779DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority County Durham, reference DM/23/03047/FPA)

How it compares

Hedley Hope, Tow Law - Wind Turbines is the 799th-largest of 1,651 power plants planned, permitted or under construction in England and the 1,311th-largest of 2,549 in the United Kingdom by capacity; its 31.5 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England799th of 1,651172,174 MW<0.1%
United Kingdom1,311th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data2,700th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 275 grid connections (135 operating, 1,375 MW), 170 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hedley Hope Farm grid connectionGrid connection49.5 MWPlanned1.1 km
Wind 4.94 MW grid connection at BrancepethGrid connection4.94 MWOperating1.1 km
Wind 7.6 MW grid connection at MeadowfieldGrid connection7.6 MWOperating2.6 km
BrancepethSubstation——5.8 km
TorontoSubstation——10 km
Toronto 66/20kVSubstation——10 km
DXC Wynyard Data CenterData center——33 km
Stellium Newcastle CampusData center——34 km
Pulsant data center, EnglandData center——37 km

Operator and place

More from Cleanearth Energy Ltd

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page