Power plant · Vale of Glamorgan, Wales, United Kingdom

Momentive Speciality Chemicals, Sully Moors Road - Solar Panels

Momentive Speciality Chemicals, Sully Moors Road - Solar Panels is a permitted power plant in Vale of Glamorgan, Wales, United Kingdom, with 1.3 MW of capacity, operated by Bakelite Synthetics Uk Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationVale of Glamorgan (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMomentive Speciality Chemicals, Sully Moors Road, Sully, CF64 5YUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date31 Jul 2023 (permit 2023/00360/FUL, Town and Country Planning Act, issued by Vale of Glamorgan)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Apr 2023 (reference 2023/00360/FUL, planning authority Vale of Glamorgan)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date31 Jul 2023 (granted, reference 2023/00360/FUL, planning authority Vale of Glamorgan)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBakelite Synthetics Uk LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4084, -3.2248DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Vale of Glamorgan, reference 2023/00360/FUL)
  2. Permit applied for (planning authority Vale of Glamorgan, reference 2023/00360/FUL)

How it compares

Momentive Speciality Chemicals, Sully Moors Road - Solar Panels is the 161st-largest of 177 power plants planned, permitted or under construction in Wales and the 2,978th-largest of 3,222 in the United Kingdom by capacity; its 1.3 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales161st of 17716,801 MW<0.1%
United Kingdom2,978th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,203rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Microsoft Newport data centreData center——20 km
Vantage Data Centers data center, NewportData center——21 km
Centerprise International NewportData center——21 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned28 km
Hinkley Point C ConnectionTransmission line—Permitted32 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom