Power plant · Newport, Wales, United Kingdom

Clearwell Farm - solar

Clearwell Farm - solar is a power plant in Newport, Wales, United Kingdom, with 2 MW of capacity, operated by Heritage Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNewport (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPentre-poeth Road, CardiffDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 May 2011 (permit 11/0339, Town and Country Planning Act, issued by Newport)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Apr 2011 (reference 11/0339, planning authority Newport)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 May 2011 (granted, reference 11/0339, planning authority Newport)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHeritage EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.51 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5622, -3.0869DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Newport, reference 11/0339)
  3. Permit applied for (planning authority Newport, reference 11/0339)

How it compares

Clearwell Farm - solar is the 371st-largest of 424 power plants in Wales and the 4,162nd-largest of 5,050 in the United Kingdom by capacity; its 2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales371st of 4249,068 MW<0.1%
United Kingdom4,162nd of 5,050115,622 MW<0.1%
All power plants in our data10,440th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 9 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Microsoft Newport data centreData center——3.4 km
Centerprise International NewportData center——3.5 km
Vantage Data Centers data center, NewportData center——3.5 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned30 km
Hinkley Point C ConnectionTransmission line—Permitted33 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating43 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page