York Solar Farm is a power plant in North Yorkshire, England, United Kingdom, with 34.7 MW of capacity, operated by Gridserve.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBoscar Grange Farm, Thirsk Road, Easingwold, York, North Yorkshire, YO61 3NQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2019DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Sept 2015 (permit 15/01268/FUL, Town and Country Planning Act, issued by North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Jun 2015 (ref. 15/01268/FUL, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Sept 2015 (granted, ref. 15/01268/FUL, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGridserveDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity34.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area74 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.1454, -1.2249DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

York Solar Farm is the 356th-largest of 3,430 power plants in England and the 670th-largest of 5,050 in the United Kingdom by capacity; its 34.7 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England356th of 3,43071,985 MW<0.1%
United Kingdom670th of 5,050115,642 MW<0.1%
All power plants in our data2,539th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 15/01268/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 245 grid connections (119 operating, 1,338 MW), 174 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Gas 27 MW grid connection at Boscar Grange GenerationGrid connection27 MWOperating0.1 km
Solar 30 MW grid connection at Village Farm Solar DirectGrid connection30 MWPlanned0.1 km
Solar 4.8 MW grid connection at Husthwaite 33/11kVGrid connection4.8 MWOperating1.1 km
HusthwaiteSubstation——1.3 km
Husthwaite 33/11kVSubstation——1.3 km
Sessay Bridge/SowerbySubstation——6.9 km
Yorkshire GREENTransmission line—Permitted27 km

Operator and place

Grid connections attached to this power plant