Uckfield Solar Electric Forecourt is a cancelled solar power plant in Wealden, England, United Kingdom, with 5.5 MW of capacity, operated by Gridserve Sustainable Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWealden (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Copwood Barn, Rocks Road, Uckfield, East Sussex, TN22 3PTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Mar 2021 (permit WD/2020/1244/MAJ, Town and Country Planning Act, issued by Wealden)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Aug 2020 (reference WD/2020/1244/MAJ, planning authority Wealden)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Mar 2021 (granted, reference WD/2020/1244/MAJ, planning authority Wealden)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGridserve Sustainable Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9692, 0.0825DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Wealden, reference WD/2020/1244/MAJ)
  2. Permit applied for (planning authority Wealden, reference WD/2020/1244/MAJ)

How it compares

Uckfield Solar Electric Forecourt is the 2,118th-largest of 4,036 power plants in England and the 3,219th-largest of 5,837 in the United Kingdom by capacity; its 5.5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,118th of 4,036134,406 MW<0.1%
United Kingdom3,219th of 5,837200,833 MW<0.1%
All power plants in our data9,027th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 14 data centers, 4 substations and 3 grid connections (2 operating, 8.66 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Goldman Sachs data center, East GrinsteadData center——20 km
Digital Realty LGW15Data center——25 km
Digital Realty LGW16Data center——25 km
Five Oaks PrimarySubstation——36 km
Solar 3.905 MW grid connection at Five Oaks Farm PVGrid connection3.91 MWOperating37 km
Billingshurst PrimarySubstation——38 km
Malham Farm Solar & Storage grid connectionGrid connection20 MWPlanned41 km
Plaistow PrimarySubstation——45 km
Solar 4.75 MW grid connection at PlaistowGrid connection4.75 MWOperating46 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page