Power plant · North Somerset, England, United Kingdom
Yanel Farm, Churchill Green - Solar Farm
Yanel Farm, Churchill Green - Solar Farm is a permitted power plant in North Somerset, England, United Kingdom, with 49.9 MW of capacity, operated by Capital Dynamics.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Somerset (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Yanel Farm Churchill Green Churchill, BS25 5QQ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 18 Apr 2024 (permit 22/P/1450/FUL, Town and Country Planning Act, issued by North Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 15 Jul 2022 (reference 22/P/1450/FUL, planning authority North Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 18 Apr 2024 (granted, reference 22/P/1450/FUL, planning authority North Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Capital Dynamics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 67.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3364, -2.8240 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority North Somerset, reference 22/P/1450/FUL)
- Permit applied for (planning authority North Somerset, reference 22/P/1450/FUL)
How it compares
Yanel Farm, Churchill Green - Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 514th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 71 grid connections (43 operating, 419 MW), 30 substations, 10 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 1.2 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 3.5 km |
| Insight Data Ltd | Data center | — | — | 6.5 km |
| Tata Communications Highbridge Datacentre | Data center | — | — | 15 km |
| Microsoft Newport data centre | Data center | — | — | 28 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 30 km |
| Holwell Primary | Substation | — | — | 33 km |
| Landmark Farm grid connection | Grid connection | 5.5 MW | Planned | 34 km |
| Holwell PV grid connection | Grid connection | 3.55 MW | Operating | 34 km |
Operator and place
More from Capital Dynamics
- Fleet Hill Solar Farm47.5 MW · under construction
- Hinckley Road - Solar Farm40 MW · permitted
- Brynrhyd Solar Farm36 MW · permitted
- Red Gap Moor Wind Farm12.5 MW
- Middle Balbeggie Wind Turbines6.4 MW
- Potato Pot Wind Farm6 MW
- Torrance Farm Wind Park Extension5.7 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.