Windy Bank Windfarm is a cancelled power plant in County Durham, England, United Kingdom, with 14 MW of capacity, operated by Banks Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand to north of the village of Woodland, south of Windy Bank RoadDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Aug 2011 (reference CMA/6/48, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 May 2015 (refused, reference CMA/6/48, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBanks RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units4 units (3.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6499, -1.8890DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority County Durham, reference CMA/6/48)
  2. Permit applied for (planning authority County Durham, reference CMA/6/48)

How it compares

Windy Bank Windfarm is the 838th-largest of 3,430 power plants in England and the 1,490th-largest of 5,050 in the United Kingdom by capacity; its 14 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England838th of 3,43071,965 MW<0.1%
United Kingdom1,490th of 5,050115,622 MW<0.1%
All power plants in our data5,490th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 256 grid connections (127 operating, 1,210 MW), 162 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 42.75 MW grid connection at Bluestone Farm PVGrid connection42.8 MWPlanned7.0 km
Battery storage and Solar 62.5 MW grid connection at Bucks Head HybridGrid connection62.5 MWPlanned8.3 km
Generation 1.425 MW grid connection at Harmire BridgeGrid connection1.43 MWOperating11 km
Harmire BridgeSubstation——11 km
TorontoSubstation——12 km
Toronto 66/20kVSubstation——12 km
DXC Wynyard Data CenterData center——37 km
Pulsant data center, EnglandData center——39 km
Lumen Technologies data center, MiddlesbroughData center——43 km

Operator and place

More from Banks Renewables

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page