Willand AD is a power plant in Mid Devon, England, United Kingdom, with 2 MW of capacity, operated by Greener for Life Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMid Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLloyd Maunder Road, Willand, Cullompton, EX15 2PJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 May 2015 (permit DCC/3725/2014, Town and Country Planning Act, issued by Mid Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Jan 2015 (reference DCC/3725/2014, planning authority Mid Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 May 2015 (granted, reference DCC/3725/2014, planning authority Mid Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreener for Life EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8926, -3.3777DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Mid Devon, reference DCC/3725/2014)
  3. Permit applied for (planning authority Mid Devon, reference DCC/3725/2014)

How it compares

Willand AD is the 2,789th-largest of 3,430 power plants in England and the 4,162nd-largest of 5,050 in the United Kingdom by capacity; its 2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,789th of 3,43071,965 MW<0.1%
United Kingdom4,162nd of 5,050115,622 MW<0.1%
All power plants in our data10,440th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 2 grid connections, 1 substation and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Newlands Power Plant grid connectionGrid connection52.5 MWPlanned33 km
Axminster GSPSubstation——34 km
Pipplepen Farm Solar PV grid connectionGrid connection32.6 MWPlanned44 km
Tata Communications Highbridge DatacentreData center——47 km

Operator and place

More from Greener for Life Energy

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page