Owner · Company

Greener for Life Energy

Greener for Life Energy operates 7 power plants in the United Kingdom.

Portfolio

The 7 assets and rights Greener for Life Energy owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.

Power plants 7

Power plantLocationRoleCapacity
Enfield FarmEast Devon, England, United KingdomOperator2 MW
Trenoweth Guidestone Biogas Plant (Farm AD)Cornwall, England, United KingdomOperator2 MW
Willand ADMid Devon, England, United KingdomOperator2 MW
The Old DairyStroud, England, United KingdomOperator1.5 MW
Bearley LaneSomerset, England, United KingdomOperator1.3 MW
Great Hele Farm AD farm wasteNorth Devon, England, United KingdomOperator1.3 MW
Hogsbrook Farm - Farm ADEast Devon, England, United KingdomOperator1 MW

By country

Where the assets and rights are.

Latest events

Dated events about Greener for Life Energy and its assets from official notices and registers, newest first: the latest 8 of 21. All recent changes.

  1. Commissioned: Bearley Lane
  2. Permit granted: Bearley Lane (planning authority Somerset, reference 14/00230/FUL)
  3. Commissioned: Great Hele Farm AD farm waste
  4. Commissioned: Enfield Farm
  5. Permit refused: The Old Dairy (appeal refused, planning authority Stroud, reference S.14/0673/FUL)
  6. Commissioned: Willand AD
  7. Commissioned: Hogsbrook Farm - Farm AD
  8. Permit granted: Willand AD (planning authority Mid Devon, reference DCC/3725/2014)

Research on Greener for Life Energy.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.

Request research

Data on this page