Power plant · East Riding of Yorkshire, England, United Kingdom

Wienerberger Limited, Tongue Lane - Solar Panels

Wienerberger Limited, Tongue Lane - Solar Panels is a cancelled solar power plant in East Riding of Yorkshire, England, United Kingdom, with 4.7 MW of capacity, operated by Wienerberger Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Riding of Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWienerberger Limited, Tongue Lane, Blacktoft, Brough, HU15 2GSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 May 2025 (reference 25/00699/PLF, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 May 2025 (withdrawn, reference 25/00699/PLF, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWienerberger Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7375, -0.6947DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority East Riding of Yorkshire, reference 25/00699/PLF)
  2. Withdrawn (planning authority East Riding of Yorkshire, reference 25/00699/PLF)

How it compares

Wienerberger Limited, Tongue Lane - Solar Panels was cancelled before it was built: it is not ranked among the power plants that run, and its 4.7 MW is not counted in their totals.

Nearby

Within 50 km of this power plant: 404 grid connections (195 operating, 2,772 MW), 189 substations, 3 transmission lines, 3 data centers and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 4 MW grid connection at Ellifoot LaneGrid connection4 MWPlanned2.8 km
Newport 1Substation——3.2 km
Newport 2Substation——3.2 km
Newport Building grid connectionGrid connection1.1 MWPlanned4.0 km
Newport Building grid connectionGrid connection1.4 MWPlanned4.0 km
Skillings LaneSubstation——8.0 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled20 km
North Humber to High MarnhamTransmission line—Planned33 km
ThalesData center——38 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom