Whitegate Battery Storage is a power plant under construction in Oldham, England, United Kingdom, with 57 MW of capacity, operated by Pelagic Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Oldham (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | The National Grid Station, Broadgate, Chadderton, Oldham, OL9 9XA | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 19 May 2022 (permit FUL/348501/22, Town and Country Planning Act, issued by Oldham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Feb 2022 (reference FUL/348501/22, planning authority Oldham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 May 2022 (granted, reference FUL/348501/22, planning authority Oldham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Pelagic Energy (Pelagic Energy (Constantine Energy)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 57 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.5330, -2.1629 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Whitegate Battery Storage is the 396th-largest of 2,174 power plants planned, permitted or under construction in England and the 710th-largest of 3,222 in the United Kingdom by capacity; its 57 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 396th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 710th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,733rd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 511 substations, 441 grid connections (244 operating, 2,198 MW), 22 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Gateway Crescent (Shaw) grid connection | Grid connection | 20 MW | Operating | 0.0 km |
| Chadderton | Substation | — | — | 0.1 km |
| Chadderton BSP | Substation | — | — | 0.1 km |
| Whitegate GSP | Substation | — | — | 0.2 km |
| Broadgate Chadderton Generation grid connection | Grid connection | 21.1 MW | Operating | 0.4 km |
| Unit A-D, the Causeway grid connection | Grid connection | 1.9 MW | Operating | 0.5 km |
| Data center, England (OSM way 703959498) | Data center | — | — | 7.2 km |
| Asanti Manchester | Data center | — | — | 7.8 km |
| Equinix MA1 | Data center | — | — | 9.1 km |
Operator and place
More from Pelagic Energy
- Battlesbridge Bypass, Rettendon - Battery Storage100 MW
- Monk Fryston Battery Storage57 MW · under construction
- Fairholme, Minety - Battery Storage50 MW · permitted
- Coopers Lane, Kirkby - Battery Storage Facility49.5 MW · permitted
- Somerford Farm, Brinkworth - Battery Storage6.63 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.