Power plant · Wiltshire, England, United Kingdom
Fairholme, Minety - Battery Storage
Fairholme, Minety - Battery Storage is a permitted power plant in Wiltshire, England, United Kingdom, with 50 MW of capacity, operated by Pelagic Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wiltshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Dog Trap Lane , Minety, SN16 9PW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 31 May 2024 (permit PL/2022/05412, Town and Country Planning Act, issued by Wiltshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Jul 2022 (reference PL/2022/05412, planning authority Wiltshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 31 May 2024 (granted, reference PL/2022/05412, planning authority Wiltshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Pelagic Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6108, -1.9755 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Wiltshire, reference PL/2022/05412)
- Permit applied for (planning authority Wiltshire, reference PL/2022/05412)
How it compares
Fairholme, Minety - Battery Storage is the 422nd-largest of 2,174 power plants planned, permitted or under construction in England and the 755th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 422nd of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 755th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,832nd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 161 grid connections (92 operating, 1,159 MW), 96 substations, 10 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Purlieus Battery Storage grid connection | Grid connection | 95 MW | Operating | 0.8 km |
| Purlieus Battery Storage grid connection | Grid connection | 49.9 MW | Operating | 1.0 km |
| Minety Village Primary | Substation | — | — | 1.7 km |
| Minety GSP | Substation | — | — | 1.8 km |
| DSO Charlton Park PV - 30MW grid connection | Grid connection | 30 MW | Planned | 1.8 km |
| Kemble RAF Primary | Substation | — | — | 8.1 km |
| Nationwide Swindon Technology Centre | Data center | — | — | 11 km |
| Vodafone | Data center | — | — | 11 km |
| nLighten Swindon | Data center | — | — | 17 km |
Operator and place
More from Pelagic Energy
- Battlesbridge Bypass, Rettendon - Battery Storage100 MW
- Whitegate Battery Storage57 MW · under construction
- Monk Fryston Battery Storage57 MW · under construction
- Coopers Lane, Kirkby - Battery Storage Facility49.5 MW · permitted
- Somerford Farm, Brinkworth - Battery Storage6.63 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.