Power plant · Chelmsford, England, United Kingdom

Battlesbridge Bypass, Rettendon - Battery Storage

Battlesbridge Bypass, Rettendon - Battery Storage is a cancelled power plant in Chelmsford, England, United Kingdom, with 100 MW of capacity, operated by Pelagic Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationChelmsford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressW/O Battlesbridge Bypass, Rettendon, Wickford, SS11 7QRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Feb 2022 (reference 22/00179/FUL, planning authority Chelmsford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 May 2022 (refused, reference 22/00179/FUL, planning authority Chelmsford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPelagic EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6390, 0.5772DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Chelmsford, reference 22/00179/FUL)
  2. Permit applied for (planning authority Chelmsford, reference 22/00179/FUL)

How it compares

Battlesbridge Bypass, Rettendon - Battery Storage is the 75th-largest of 3,430 power plants in England and the 134th-largest of 5,050 in the United Kingdom by capacity; its 100 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England75th of 3,43071,965 MW0.14%
United Kingdom134th of 5,050115,622 MW<0.1%
All power plants in our data1,245th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 48 data centers (1 operating, 88 MW), 2 grid connections (1 operating, 6.94 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Imperium 315Data center——8.6 km
CityFibre CabinetsData center——9.0 km
Fujitsu Data CentreData center——28 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating34 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating38 km
North London (Electricity Line) ReinforcementTransmission line—Permitted43 km
Bramford to TwinsteadTransmission line—Permitted45 km
Tertiary Study grid connectionGrid connection57 MWPlanned48 km