Power plant · Luton, England, United Kingdom

Vauxhall Motors Solar Farm

Vauxhall Motors Solar Farm is a cancelled solar power plant in Luton, England, United Kingdom, with 5 MW of capacity, operated by PerPetum Sun.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLuton (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressVauxhall Motors, Luton Road, Chalton, Luton, LU4 9TTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Nov 2015 (permit CB/15/03550/FULL, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Sept 2015 (reference CB/15/03550/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Nov 2015 (granted, reference CB/15/03550/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPerPetum Sun (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9149, -0.4779DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Central Bedfordshire, reference CB/15/03550/FULL)
  2. Permit applied for (planning authority Central Bedfordshire, reference CB/15/03550/FULL)

How it compares

Vauxhall Motors is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,910th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 90 data centers (1 operating, 88 MW), 83 substations, 43 grid connections (24 operating, 285 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——2.5 km
NTT Hemel Hempstead 2Data center——17 km
NTT Hemel Hempstead 3Data center——17 km
Cokes Lane PrimarySubstation——28 km
East Claydon GSPSubstation——30 km
Amersham GSPSubstation——30 km
Generation 99 MW grid connection at Amersham MainGrid connection99 MWPlanned31 km
Harefield Solar grid connectionGrid connection30 MWPlanned36 km
Derehams Farm grid connectionGrid connection100 MWPlanned37 km

Operator and place

More from PerPetum Sun

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page