Luton And Dunstable Hospital grid connection

Luton And Dunstable Hospital grid connection is a grid connection in England, United Kingdom, with 2 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Luton And Dunstable Hospital grid connection lies
51.8938, -0.4746 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Lewsey Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toLewsey Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity2 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyOilUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date23 Feb 2023UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8938, -0.4746UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Luton And Dunstable Hospital grid connection is the 2,993rd-largest of 3,539 grid connections in England and the 4,136th-largest of 4,870 in the United Kingdom by capacity; its 2 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,993rd of 3,539341,715 MW<0.1%
United Kingdom4,136th of 4,870467,981 MW<0.1%
All grid connections in our data7,868th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 436 power plants (160 operating, 3,741 MW), 365 substations, 99 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chaul End Primary 11kVSubstation——1.6 km
Data center, Dunstable (OSM way 526426719)Data center——1.9 km
Lewsey Primary 11kVSubstation——1.9 km
Boscombe Road (Unit DC1)Power plant1.3 MWCancelled2.0 km
Dc1 Boscombe RoadPower plant1.7 MWCancelled2.0 km
Avenue Power - Urban Reserve Flexible Energy FacilityPower plant5 MWCancelled2.3 km
Houghton Regis Grid 33kVSubstation——2.6 km
NTT Hemel Hempstead 2Data center——15 km
NTT Hemel Hempstead 3Data center——15 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom