Power plant · Central Bedfordshire, England, United Kingdom

Unit DC1 Prologis

Unit DC1 Prologis is a cancelled power plant in Central Bedfordshire, England, United Kingdom, with 1.1 MW of capacity, operated by Solar Sense.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit DC1 Prologis, Boscombe Road, Dunstable, LU5 4FADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Oct 2015 (permit CB/15/03890/LDON, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jul 2015 (reference CB/15/03890/LDON, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Oct 2015 (granted, reference CB/15/03890/LDON, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSolar SenseDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8927, -0.5118DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Unit DC1 Prologis is the 3,268th-largest of 3,430 power plants in England and the 4,829th-largest of 5,050 in the United Kingdom by capacity; its 1.1 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,268th of 3,43071,985 MW<0.1%
United Kingdom4,829th of 5,050115,642 MW<0.1%
All power plants in our data11,669th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 140 grid connections (29 operating, 324 MW), 95 data centers (1 operating, 88 MW), 92 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——0.9 km
NTT Hemel Hempstead 2Data center——15 km
NTT Hemel Hempstead 3Data center——15 km
Milton Keynes, Woburn Sands grid connectionGrid connection——16 km
Bletchley Landfill Site grid connectionGrid connection——18 km
34130902 grid connectionGrid connection——18 km
Cokes Lane PrimarySubstation——25 km
Amersham GSPSubstation——27 km
East Claydon GSPSubstation——28 km