Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage is a planned battery storage plant in Runnymede, England, United Kingdom, with 5 MW of capacity, operated by Runnymede Borough Council.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Runnymede (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Twynersh Meadows Land west of Thorpe Road and north of St Anns Road, KT16 9EJ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Jul 2025 (reference RU.25/0843, planning authority Runnymede) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Runnymede Borough Council (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3951, -0.5121 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Runnymede, reference RU.25/0843)
How it compares
Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage is the 1,280th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,046th-largest of 2,548 in the United Kingdom by capacity; its 5 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,280th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 2,046th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,196th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 192 substations, 152 data centers (1 operating, 88 MW), 120 grid connections (66 operating, 753 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Waste 3.325 MW grid connection at Causeway | Grid connection | 3.33 MW | Operating | 1.8 km |
| Laleham GSP | Substation | — | — | 4.4 km |
| Causeway Primary | Substation | — | — | 4.5 km |
| Sidney Road Primary | Substation | — | — | 4.5 km |
| Ready - 200MW Battery grid connection | Grid connection | 200 MW | Planned | 5.0 km |
| Generation 1.7 MW grid connection at Sunbury Cross | Grid connection | 1.7 MW | Operating | 5.0 km |
| Redcentric Byfleet | Data center | — | — | 5.7 km |
| Ark Data Centres - Longcross Park | Data center | — | — | 6.0 km |
| Serverfarm LON1 – London Data Center | Data center | — | — | 7.0 km |
Operator and place
More from Runnymede Borough Council
- Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage5.5 MW · planned
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.